loading
GDS-118P5
Migrand
| Availability: | |
|---|---|
|
| |
How To Change The Mold of FFS Machine(Plastic ampoule forming filling sealing machine)
Step 1:Preparations before mold removal
Step 3: Install the forming mold
Step 4: Install the heat sealing mold and the scrap cutter
Step 5: Install the Punching mold and roll film
5 seconds:Turn off the filling needle clamp lifting cylinder switch
16 seconds:Lower the holder to the lowest position and insert the filling head in order
45 seconds:Adjust the height of the filling needle to insert into the bottle mouth for 5mm, and lock the screw.
1 minute 12 seconds:Locking bracket screw
1 minute27 seconds:Manually test whether the lifting of the cylinder is smooth and free of blockage
1 minute 33 seconds:After completion, open the air pipe switch of the filling cylinder, otherwise the lifting cylinder will not reset, and the film will be pulled during operation, resulting in dislocation.